In use for palletting unit’ s cartoon-plastic consumption utilization. (Mila)
Oven
In serial – mass production phase & patented
Water glue unit
In use for palletting unit’ s cartoon-plastic consumption utilization. (Mila)
Benzol loading station
Loading process of Benzol is obtained, ATEX compliant.
Mechanical Assembly Line
Seat, cockpit and bumper lines for one of the leading companies in the automotive industry.
1206 meters of aluminum rails & 490 C hooks
250 straps & 235 hangers
750 meters of Caldan Suspension
Project duration is 10 months
FMCG Line Relocation
Mechanical and electrical marking
Disassembly and reassembly
Electrical and mechanical commissioning
52 containers relocated in 5 months
Robotic installation
ASRS «Automated Storage and Retrieval Systems» Warehouse System Robot storage system installation Project at the cargo section of Istanbul Airport for a leading company in the industry
Grounding and welding the rails
Busbars & wire trays
Aligning the 14m, 4.5t robots along the rails with their equipment
Complete factory setup
Battery line assembly in automotive industry
Machinery consist of 97 trucks
Mechanical and electrical installation appropriate to layout
Commissioning and handover